Guttering

With the facia boards in place and pencil marks at 700mm centre in between the capping nails it was ready for the brackets. The first step was to mark where the running outlest are going. This I done by dropping a plumb line in the centre if the drain. The same was done on the other end.
I fixed one running outlet using 2 screws and made sure it was level. I had a slope in mind to I kept one end lower than the other about 40mm over a 14mm stretch. At this point I had not idea the rain would run properly. Another string line was fixed to both running outlets and again at 700mm centres brackets were fixed just under the 4m lengh of gutter. I snapped in the gutter just to test where the water would run. Seemed ok.